← Back to map

Bynum Solar Project

Coryell County, Texas · EIA plant ID 69360 · Operator: Bynum Solar Project LLC (RE)
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate56MWSummer 55 MW
Generators1in service
Net generation67GWh12 mo to Aug 2026
Capacity factor41%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2026202741.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAYS1Solar PhotovoltaicPV5655May 2026Operating—coming soon

Owner / operator

Operator: Bynum Solar Project LLC (RE). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bynum Solar Project LLC (RE)100.0%56 MW

Nearby plants

Within 80 km.
Symank Solar—5 km
Ryan Storage—13.8 km
Albatross Solar, LLC—25.5 km
Dileo Solar71 MW26.2 km
BT Hickerson Solar, LLC310 MW29.6 km
EDFR Bluebonnet10 MW29.9 km