← Back to map

Fortress 1Planned

Morgan County, Colorado · EIA plant ID 69278 · Operator: Fortress Solar 1 LLC
SolarBA: PSCO

399 MW planned (Batteries, Solar Photovoltaic), first expected Mar 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV199199planned Mar 2028Planned—coming soon
2BatteriesBA150150planned Mar 2028Planned—coming soon
3BatteriesBA49.949.9planned Mar 2028Planned—coming soon

Owner / operator

Operator: Fortress Solar 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Mtn. Solar 3 CSG2 MW4.8 km
Brush Generation Facility273 MW5.6 km
Pivot Solar 524 MW5.6 km
Pivot Solar 325 MW5.7 km
Pivot Solar 71 LLC—6.9 km
Pivot Solar 2 LLC (CSG)2 MW7.5 km