← Back to map

Fairfield Solar Project

Freestone County, Texas · EIA plant ID 69263 · Operator: Ellomay USA Inc
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate10MWSummer 10 MW
Generators1in service
Net generation14GWh12 mo to Dec 2025
Capacity factor65%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2025202665.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202514.465.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
FRFWSSolar PhotovoltaicPV1010Oct 2025Operating—coming soon

Owner / operator

Operator: Ellomay USA Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Ellomay USA Inc100.0%10 MW

Nearby plants

Within 80 km.
Avant Prairie ESS—11.6 km
Piedra Solar—16.7 km
Timber Cove Solar—17.7 km
Amerada—17.8 km
Freestone Energy Center1,036 MW20.8 km
Pin Oak Creek Energy Center, LLC444 MW21.2 km