← Back to map

BESS TX Camarine - BSHOU001Under construction

Harris County, Texas · EIA plant ID 69246 · Operator: Prologis Logistics Services Incorporated BESS
BatteryERCOTBA: ERCO

10 MW under construction (Batteries), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 10 MW building
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSOU1BatteriesBA9.99.9planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Prologis Logistics Services Incorporated BESS. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Regis Hidden Valley10 MW4.8 km
WAL45261 MW6.6 km
WAL22571 MW7.7 km
BESS TX Panda - BSHOU00410 MW8.2 km
HEBHoustonDistributionCenter13 MW10.7 km
Regis Gears Harris10 MW10.7 km