Muskogee County, Oklahoma · EIA plant ID 69239 · Operator: High Spring Solar Energy
SolarSPPBA: SWPP

400 MW planned (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HSSSolar PhotovoltaicPV400250.4planned Dec 2027Planned—coming soon

Owner / operator

Operator: High Spring Solar Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Muskogee Mill114 MW37.2 km
Muskogee1,716 MW39.3 km
Eufaula Dam90 MW40.5 km
Webbers Falls75 MW44.2 km
Oneta Energy Center1,214 MW48.5 km
Fort Gibson45 MW50.7 km