State Route 42
Sullivan County, New York · EIA plant ID 69216 · Operator: Generate Capital
Nameplate5MWSummer 5 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 11164 | Solar Photovoltaic | PV | 5 | 5 | Dec 2025 | Operating | — | coming soon |
Owner / operator
Operator: Generate Capital. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Generate C&I Warehouse, LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Mongaup Falls | 7 MW | 2.2 km |
| Swinging Bridge 2 | 8 MW | 3.7 km |
| Rio | 11 MW | 9.6 km |
| State Highway 17B Solar | 4 MW | 18.2 km |
| BQ - Psychedelic Site CSG | 3 MW | 18.9 km |
| NY Finchville Tpke CSG | 2 MW | 19.7 km |