← Back to map

San Pedro Public Market (SPPM)Under construction

Los Angeles County, California · EIA plant ID 69211 · Operator: SPPM Operating, LLC
SolarBA: LDWP

1 MW under construction (Solar Photovoltaic), first expected Jun 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 1 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV1.21.2planned Jun 2027Under construction—coming soon

Owner / operator

Operator: SPPM Operating, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Pacific Cruise Ship Terminals Berth 931 MW0.3 km
Port of LA Solar FiT Project1 MW0.4 km
Alta Sea2 MW1.5 km
Marina South1 MW1.5 km
Catalina Express1 MW2.1 km
Westmont 4013 MW3.6 km