Red Bud Solar Plant

Nash County, North Carolina · EIA plant ID 69172 · Operator: Duke Energy Carolinas, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate80MWSummer 80 MW
Generators1in service
Net generation126GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202719.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202527.615.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
68055Solar PhotovoltaicPV8080Oct 2025Operating—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Progress - (NC)100.0%80 MW

Nearby plants

Within 80 km.
Tate Solar5 MW1.4 km
North Nash Farm, LLC5 MW1.6 km
Innovative Solar 60, LLC2 MW3.1 km
Nash 58 Farm5 MW3.4 km
Innovative Solar 59, LLC2 MW4.3 km
Nashville Farms, LLC2 MW4.9 km