Penobscot Narrows Solar I
Hancock County, Maine · EIA plant ID 69134 · Operator: Penobscot Narrows Solar I LLC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2024
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 7.2 | 16.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 22616 | Solar Photovoltaic | PV | 5 | 5 | Jun 2024 | Operating | — | coming soon |
Owner / operator
Operator: Penobscot Narrows Solar I LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Penobscot Narrows Solar I LLC | 100.0% | 5 MW |
Nearby plants
Within 80 km.
| Bucksport Generation LLC | 187 MW | 1.8 km |
| Emery Shute Solar One | — | 7.5 km |
| Penobscot Energy Recovery | 25 MW | 16.5 km |
| BWC Jimmie Pond | 5 MW | 18.1 km |
| Brewer PV, LLC | 5 MW | 19.1 km |
| Pine Tree Landfill Gas to Energy | retired | 20.3 km |