Fresno-Clovis RWRF
Fresno County, California · EIA plant ID 69072 · Operator: Forefront Power, LLC
Nameplate17MWSummer 17 MW
Generators2in service
Net generation28GWh12 mo to Dec 2025
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2025
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 27.6 | 29.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 19064 | Solar Photovoltaic | PV | 14.2 | 14.2 | Apr 2025 | Operating | — | coming soon |
| 20 | Batteries | BA | 2.3 | 2.3 | May 2025 | Operating | — | coming soon |
Owner / operator
Operator: Forefront Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Forefront Power, LLC | 100.0% | 17 MW |
Nearby plants
Within 80 km.
| Fresno Community Solar | 10 MW | 1 km |
| La Joya Del Sol | 2 MW | 8.9 km |
| OK Produce Fresno Carport | 2 MW | 10.7 km |
| SCCCD - Fresno Community College | 2 MW | 10.9 km |
| JD Foods - JD Foods | 2 MW | 13 km |
| Malaga Power LLC | 121 MW | 13.5 km |