Pivot Solar 36Under construction

Weld County, Colorado · EIA plant ID 69035 · Operator: Pivot Energy
SolarBA: WACM

5 MW under construction (Solar Photovoltaic), first expected Jan 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PI36Solar PhotovoltaicPV55planned Jan 2027Under construction—coming soon

Owner / operator

Operator: Pivot Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Pivot Solar 56 LLC—0.9 km
Pivot Solar 33 LLC—2.3 km
Pivot Solar 354 MW2.7 km
Gilcrest V CSG5 MW4.6 km
Lark Bunting Solar CSG5 MW5.1 km
Gilcrest Solar2 MW7.7 km