Gilman Solar LLCUnder construction
Iroquois County, Illinois · EIA plant ID 68972 · Operator: Gilman Solar LLC PV
5 MW under construction (Solar Photovoltaic), first expected Sep 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 5 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 11253 | Solar Photovoltaic | PV | 4.5 | 4.5 | planned Sep 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Gilman Solar LLC PV. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Iroquois Solar 1B LLC CSG | 2 MW | 20.6 km |
| Pilot Hill Wind Farm | 175 MW | 26.5 km |
| Kelly Creek Wind Project | 184 MW | 28.1 km |
| Pioneer Trail Wind Farm, LLC | 150 MW | 33.4 km |
| USS Goodrich Solar | 2 MW | 35.1 km |
| Blooming Grove Wind Energy Center | 250 MW | 35.3 km |