← Back to map

Blue Jay Road Solar, LLCUnder construction

Ralls County, Missouri · EIA plant ID 68926 · Operator: Birch Creek Development
SolarMISOBA: MISO

66 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 66 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BLUEJSolar PhotovoltaicPV6666planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Birch Creek Development. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Huck Finn Renewable Energy Center200 MW7.5 km
Audrain Generating Station814 MW8 km
Vandalia Renewable Energy Center50 MW12.5 km
MJMEUC Generating Station #113 MW17.2 km
Clarence Cannon58 MW18.7 km
Bowling Green Renewable Energy Center50 MW26.1 km