← Back to map

Enterprise BESSPlanned

San Diego County, California · EIA plant ID 68923 · Operator: Enterprise BESS LLC
BatteryCAISOBA: CISO

54 MW planned (Batteries), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ENTBBatteriesBA54.152planned Dec 2027Planned—coming soon

Owner / operator

Operator: Enterprise BESS LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
CalPeak Power Enterprise Peaker Plant59 MW0 km
Palomar Energy559 MW0.2 km
Escondido Energy Storage30 MW0.4 km
Escondido Energy Center54 MW0.5 km
Goal Line LP51 MW1.7 km
Lake Hodges Hydroelectric Facilityretired7 km