← Back to map

AVI Bakersfield

Kern County, California · EIA plant ID 68922 · Operator: Anthony Vineyards, Inc.
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20242025202614.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20243.216.6%—
20252.814.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAKSolar PhotovoltaicPV2.22.2Jun 2022Operating—coming soon

Owner / operator

Operator: Anthony Vineyards, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Anthony Vineyards, Inc.100.0%2 MW

Nearby plants

Within 80 km.
Adobe Solar20 MW3.6 km
Tejon Castac Water District Solar1 MW8.9 km
Orion Solar II8 MW9.7 km
Orion Solar I12 MW9.7 km
Blue Skies Solar, LLC1 MW10 km
Wheeler Ridge 25 MW10.4 km