P66 Rodeo Solar

Contra Costa County, California · EIA plant ID 68890 · Operator: P66 Rodeo Solar
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate30MWSummer 30 MW
Generators1in service
Net generation57GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202721.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20253714.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
P66RSSolar PhotovoltaicPV30.230.2Apr 2023Operating—coming soon

Owner / operator

Operator: P66 Rodeo Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
P66 Rodeo Solar100.0%30 MW

Nearby plants

Within 80 km.
Phillips 66 Rodeo Refinery55 MW1.2 km
Phillips 66 Carbon Plantretired2.2 km
Bio-Rad2 MW2.7 km
C&H Sugar Plant8 MW3.5 km
Crockett Cogen Project247 MW3.6 km
Valero Refinery Cogeneration Unit 150 MW10.2 km