← Back to map

Bridgewater 2Planned

Saratoga County, New York · EIA plant ID 68864 · Operator: Bridgewater Solar 2, LLC
SolarNYISOBA: NYIS

5 MW planned (Solar Photovoltaic), first expected Dec 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV55planned Dec 2030Planned—coming soon

Owner / operator

Operator: Bridgewater Solar 2, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bridgewater 1—0 km
Town of Halfmoon1 MW0.4 km
Crescent12 MW4.9 km
Mechanicville Hydroelectric Station4 MW5 km
Fourth Branch Hydroelectric Facility3 MW5.1 km
Colonie LFGTE Facility6 MW5.3 km