Arvah B Hopkins
Leon County, Florida · EIA plant ID 688 · Operator: City of Tallahassee - (FL)
Nameplate673MWSummer 485 MW
Generators9in service
Net generation1,657GWh12 mo to Aug 2026
Capacity factor39%gas/coal/oil units, summer MW
Heat rate7,955Btu/kWhfossil units, electric fuel, HHV
First online1977Runs as intermediate
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 783.1 | — | — |
| 2002 | 740.9 | — | — |
| 2003 | 758.8 | 25.5% | 11,384 |
| 2004 | 907.5 | 30.4% | 11,435 |
| 2005 | 804.3 | 25.3% | 11,298 |
| 2006 | 786.5 | 20.8% | 11,251 |
| 2007 | 814.6 | 21.5% | 11,366 |
| 2008 | 973.5 | 28.9% | 8,982 |
| 2009 | 1,325.9 | 30.0% | 8,423 |
| 2010 | 1,439.7 | 32.6% | 8,477 |
| 2011 | 1,375.5 | 31.1% | 8,418 |
| 2012 | 1,433.6 | 32.4% | 8,365 |
| 2013 | 1,566.2 | 35.5% | 8,366 |
| 2014 | 1,536 | 34.8% | 8,436 |
| 2015 | 1,378.8 | 31.2% | 8,688 |
| 2016 | 1,658.7 | 37.5% | 8,731 |
| 2017 | 1,384.7 | 32.9% | 8,820 |
| 2018 | 1,610.2 | 40.4% | 8,793 |
| 2019 | 1,579.3 | 38.7% | 8,140 |
| 2020 | 1,623.6 | 38.5% | 8,076 |
| 2021 | 1,411.8 | 33.3% | 8,088 |
| 2022 | 1,558.7 | 36.7% | 8,018 |
| 2023 | 1,646.2 | 38.8% | 7,934 |
| 2024 | 1,751.8 | 41.2% | 7,980 |
| 2025 | 1,646.4 | 38.8% | 7,959 |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusLikely still dual fuel
Liquid fuel burned · 36 mo130,921 MMBtu
Last month with liquid burnMar 2026
Switch while operatingYes
Net summer MW on gas384
Net summer MW on oil384
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 2 | Natural Gas Fired Combined Cycle | CA | 259.2 | 141 | Oct 1977 | Operating | — | coming soon |
| CT 2A | Natural Gas Fired Combined Cycle | CT | 198.9 | 159 | Oct 2008 | Operating | — | coming soon |
| GT3 | Natural Gas Fired Combustion Turbine | GT | 60.5 | 46 | Sep 2005 | Operating | — | coming soon |
| GT4 | Natural Gas Fired Combustion Turbine | GT | 60.5 | 46 | Nov 2005 | Operating | — | coming soon |
| IC1 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.5 | Jan 2019 | Operating | — | coming soon |
| IC2 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.5 | Jan 2019 | Operating | — | coming soon |
| IC3 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.5 | Jan 2019 | Operating | — | coming soon |
| IC4 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.5 | Jan 2019 | Operating | — | coming soon |
| IC5 | Natural Gas Internal Combustion Engine | IC | 18.8 | 18.5 | Apr 2020 | Operating | — | coming soon |
| 1 | Natural Gas Steam Turbine | ST | 75 | 76 | May 1971 | Retired Nov 2018 | — | coming soon |
| GT1 | Natural Gas Fired Combustion Turbine | GT | 16.3 | 12 | Feb 1970 | Retired May 2017 | — | coming soon |
| GT2 | Natural Gas Fired Combustion Turbine | GT | 27 | 24 | Sep 1972 | Retired May 2017 | — | coming soon |
Owner / operator
Operator: City of Tallahassee - (FL). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Tallahassee - (FL) | 100.0% | 673 MW |
Nearby plants
Within 80 km.
| CoTAL Solar Farm | 20 MW | 9.2 km |
| Sub 12 | 19 MW | 13.4 km |
| FL Solar D2, LLC | 2 MW | 19.6 km |
| FL Solar D1, LLC | 4 MW | 22.7 km |
| FL Solar 4, LLC | 42 MW | 29.5 km |
| S O Purdom | 270 MW | 37.5 km |