Tri County - TenK
Texas County, Oklahoma · EIA plant ID 68725 · Operator: Today's Power, Inc.
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2024 | 1 | 10.9% | — |
| 2025 | 1.6 | 18.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| TRICO | Solar Photovoltaic | PV | 1 | 1 | Apr 2016 | Operating | — | coming soon |
Owner / operator
Operator: Today's Power, Inc.. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Today's Power, Inc. | 100.0% | 1 MW |
Nearby plants
Within 80 km.
| Hugoton 2 | 19 MW | 35.9 km |
| Panhandle Solar | — | 37.7 km |
| KODE Novus I | retired | 39.7 km |
| KODE Novus II | retired | 44.1 km |
| Arkalon Ethanol LLC | 3 MW | 44.2 km |
| Noble Great Plains Windpark LLC | 114 MW | 44.5 km |