← Back to map

Saddleback Solar

Berkshire County, Massachusetts · EIA plant ID 68680 · Operator: SoCore Energy LLC
SolarBatteriesSolar PhotovoltaicISONEBA: ISNE
Nameplate6MWSummer 6 MW
Generators2in service
Net generation4GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2022

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%20242025202614.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20243.511.2%—
20254.514.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BA1BatteriesBA2.52.5Sep 2022Operating—coming soon
PV1Solar PhotovoltaicPV3.63.6Sep 2022Operating—coming soon

Owner / operator

Operator: SoCore Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SoCore Energy LLC100.0%6 MW

Nearby plants

Within 80 km.
Skyline Solar8 MW3.7 km
Partridge Solar8 MW5.3 km
Jiminy Peak Wind QF2 MW5.3 km
East Acres Solar NG, LLC6 MW5.5 km
Pittsfield 44 - M&W PV1 MW5.5 km
Nexamp Peak CSG2 MW5.6 km