← Back to map

East Windsor

Hartford County, Connecticut · EIA plant ID 68674 · Operator: NJR Clean Energy Ventures Corporation
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate4MWSummer 4 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor7%solar units, summer MW
Heat rate—thermal plants only
First online2025

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%2%4%6%202520267.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20250.97.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
EWNDRSolar PhotovoltaicPV44Sep 2025Operating—coming soon

Owner / operator

Operator: NJR Clean Energy Ventures Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
NJR Clean Energy Ventures Corporation100.0%4 MW

Nearby plants

Within 80 km.
ALDI DC 21 MW2.7 km
Norcap South2 MW3.5 km
Norcap North2 MW3.7 km
Gravel Pit Solar, LLC120 MW4.3 km
Ticket Network South Windsor1 MW4.7 km
East Windsor Solar Two4 MW5.2 km