← Back to map

Kern Del Oro

Kern County, California · EIA plant ID 68614 · Operator: REC KDO, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2024

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh20242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%20242025202614.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202400.4%—
20251.514.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
KDOROSolar PhotovoltaicPV1.21.2Dec 2024Operating—coming soon

Owner / operator

Operator: REC KDO, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
REC KDO, LLC100.0%1 MW

Nearby plants

Within 80 km.
Bakersfield 1111 MW2.3 km
Bakersfield PV 15 MW3 km
Bakersfield Industrial PV 11 MW3.7 km
Kern Oil & Refining Co5 MW5.7 km
Hayworth Solar27 MW9.8 km
Allied Potato1 MW10 km