← Back to map

Hardin Solar III

Hardin County, Ohio · EIA plant ID 68591 · Operator: Hardin Solar Energy III
SolarSolar PhotovoltaicPJMBA: PJM
Nameplate250MWSummer 250 MW
Generators1in service
Net generation530GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20252026202724.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025470.625.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
HARD3Solar PhotovoltaicPV250250Mar 2025Operating—coming soon

Owner / operator

Operator: Hardin Solar Energy III. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hardin Solar Energy III100.0%250 MW

Nearby plants

Within 80 km.
Hardin Solar Energy LLC150 MW3 km
Hardin Solar Energy II LLC150 MW5.5 km
Ohio Northern University Solar Site3 MW9.4 km
Hog Creek Wind Project66 MW13.5 km
Scioto Ridge Wind Farm250 MW14.3 km
AEP Bluffton NaSretired24.7 km