Palmdale Water District 6MG TankUnder construction
Los Angeles County, California · EIA plant ID 68542 · Operator: East Avenue South Solar Project 2022, LLC
1 MW under construction (Batteries, Solar Photovoltaic), first expected Nov 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 1 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 7170B | Batteries | BA | 0.3 | 0.3 | planned Nov 2026 | Under construction | — | coming soon |
| 7170G | Solar Photovoltaic | PV | 1 | 1 | planned Nov 2026 | Under construction | — | coming soon |
Owner / operator
Operator: East Avenue South Solar Project 2022, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Palmdale Water District HQ | — | 4.1 km |
| Lockheed Martin Palmdale Solar PV | 21 MW | 5.6 km |
| Pacifico Power Palmdale 01 | 4 MW | 6.2 km |
| Rutan | 4 MW | 10.4 km |
| Solar Oasis LLC | 20 MW | 10.8 km |
| Arrache 8083 | 4 MW | 11.3 km |