← Back to map

Sienna 2 Solar and Storage ProjectPlanned

San Bernardino County, California · EIA plant ID 68486 · Operator: 44ST 8ME LLC
SolarCAISOBA: CISO

110 MW planned (Batteries, Solar Photovoltaic), first expected Mar 2029 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
44STASolar PhotovoltaicPV5555planned Mar 2029Planned—coming soon
44STBBatteriesBA5555planned Mar 2029Planned—coming soon

Owner / operator

Operator: 44ST 8ME LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Sienna Solar Farm—2.7 km
Lone Valley Solar Park II LLC20 MW11.2 km
Lone Valley Solar Park I LLC10 MW12.3 km
Longboat Solar, LLC20 MW16.1 km
Powhatan Solar Power Generation Station 1 LLC2 MW23.4 km
Foundation Cemex BMQ3 MW24.1 km