Laurens SolarPlanned

Laurens County, Georgia · EIA plant ID 68480 · Operator: Laurens Solar I, LLC
SolarBA: SOCO

150 MW planned (Solar Photovoltaic), first expected Jun 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LS1Solar PhotovoltaicPV150150planned Jun 2028Planned—coming soon

Owner / operator

Operator: Laurens Solar I, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Dublin Solar I4 MW17.4 km
Richland Solar Center20 MW25.9 km
WestRock Southeast, LLC.82 MW26.4 km
Arnold Cochran2 MW29.4 km
Coody Cochran3 MW33.9 km
Twiggs Solar204 MW35.6 km