Brazoria Solar IUnder construction
Brazoria County, Texas · EIA plant ID 68410 · Operator: Brazoria Solar i, LLC
250 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 250 MW building
Net generation509GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 173.1 | — | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| BRAZ | Solar Photovoltaic | PV | 125 | 125 | planned Oct 2026 | Under construction | — | coming soon |
| BRAZ2 | Solar Photovoltaic | PV | 125 | 125 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Brazoria Solar i, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Angleton | 10 MW | 7.5 km |
| Gambit Energy Storage - Angleton Storage | 100 MW | 7.9 km |
| Winmil Clean Energy Center (BESS) | 12 MW | 11.2 km |
| Myrtle Storage | 150 MW | 11.3 km |
| Myrtle Solar, LLC | — | 11.4 km |
| Mark One Power Station | 484 MW | 11.4 km |