Bronson Solar

Levy County, Florida · EIA plant ID 68372 · Operator: Bronson Solar LLC
SolarSolar PhotovoltaicBA: FPC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation187GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202728.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202565.930.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BROSSolar PhotovoltaicPV74.574.5Sep 2025Operating—coming soon

Owner / operator

Operator: Bronson Solar LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Bronson Solar LLC100.0%75 MW

Nearby plants

Within 80 km.
Gilchrist County Solar75 MW17.6 km
Whistling Duck I75 MW18.7 km
Hardeetown Solar Power Plant75 MW21.4 km
Trenton11 MW24.2 km
Trenton Solar Power Plant75 MW28.4 km