← Back to map

Pepper Solar FarmPlanned

McLennan County, Texas · EIA plant ID 68359 · Operator: Pepper Solar Farm, LLC
SolarERCOTBA: ERCO

120 MW planned (Solar Photovoltaic), first expected Aug 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
OCPSFSolar PhotovoltaicPV120120planned Aug 2027Planned—coming soon

Owner / operator

Operator: Pepper Solar Farm, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
PP Jaguar BESS LLC300 MW11.3 km
Prairie Hill Wind Project300 MW19.6 km
Leitrim Solar Park—19.8 km
Sun Valley Storage123 MW20.1 km
Sun Valley Solar Project250 MW21.5 km
Waco Solar400 MW21.8 km