← Back to map

Abercrombie SolarPlanned

Richland County, North Dakota · EIA plant ID 68339 · Operator: Otter Tail Power Co
SolarMISOBA: MISO

295 MW planned (Solar Photovoltaic), first expected Aug 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV295.1295.1planned Aug 2028Planned—coming soon

Owner / operator

Operator: Otter Tail Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Novel Blilie Solar LLC—23.1 km
Kindred School2 MW28.4 km
Centennial Generating Station12 MW49.1 km
Lake Region Community Hybrid, LLC3 MW51.9 km
Moorhead Wind Turbine1 MW52.4 km
Marvin Composites3 MW52.5 km