Dutchman Solar generation and BESSPlanned
Converse County, Wyoming · EIA plant ID 68317 · Operator: DUTC bn, LLC
998 MW planned (Batteries, Solar Photovoltaic), first expected Jun 2029 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| DUTC1 | Solar Photovoltaic | PV | 499 | 499 | planned Jun 2029 | Planned | — | coming soon |
| DUTC2 | Batteries | BA | 499 | 499 | planned Jun 2029 | Planned | — | coming soon |
Owner / operator
Operator: DUTC bn, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Dave Johnston | 817 MW | 5 km |
| Top of the World Windpower Project | 200 MW | 6.5 km |
| Glenrock | 166 MW | 16.3 km |
| Pioneer Wind Park, LLC | 80 MW | 16.4 km |
| Rolling Hills | 116 MW | 20.8 km |
| Campbell Hill Windpower | 99 MW | 21.7 km |