← Back to map

Box Canyon (AZ)

Pinal County, Arizona · EIA plant ID 68281 · Operator: BOCA bn, LLC
SolarSolar PhotovoltaicBA: AZPS
Nameplate300MWSummer 300 MW
Generators1in service
Net generation863GWh12 mo to Aug 2026
Capacity factor33%solar units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0255075100GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202732.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025506.932.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BOCA1Solar PhotovoltaicPV300300Jun 2025Operating—coming soon

Owner / operator

Operator: BOCA bn, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
BOCA bn, LLC100.0%300 MW

Nearby plants

Within 80 km.
Copper Crossing Energy Center153 MW10.7 km
Poseidon Solar, LLC20 MW10.7 km
Bonnybrooke PV50 MW12.3 km
Sandstone Solar45 MW15 km
Banner Solar Ironwood1 MW19.3 km
Valley Farms Energy Center—25 km