← Back to map

SR Wynne SouthPlanned

Cross County, Arkansas · EIA plant ID 68258 · Operator: SR Wynne South, LLC
SolarMISOBA: MISO

5 MW planned (Solar Photovoltaic), first expected Dec 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WYNSSolar PhotovoltaicPV4.84.8planned Dec 2026Planned—coming soon

Owner / operator

Operator: SR Wynne South, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Quartz Solar, LLC135 MW0.5 km
Crossover Wind144 MW5.4 km
SR Cherry Valley5 MW17.8 km
Forrest City- Eldridge Road1 MW19.5 km
Woodruff Electric Cooperative1 MW19.6 km
Cherry Valley PV I135 MW19.8 km