← Back to map

Beaverdam Renewable Energy Center

Laurens County, South Carolina · EIA plant ID 68223 · Operator: Duke Energy Carolinas, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate41MWSummer 42 MW
Generators1in service
Net generation37GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02468GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2026202719.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
67693Solar PhotovoltaicPV40.842Mar 2026Operating—coming soon

Owner / operator

Operator: Duke Energy Carolinas, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Carolinas, LLC100.0%41 MW

Nearby plants

Within 80 km.
Pinson Solar Farm20 MW8.6 km
Union Renewable Energy Facility3 MW19.7 km
Enoree Phase II Landfill Gas Recoveryretired22.2 km
Boyds Mill Hydro1 MW26.2 km
Berry Road Solar2 MW27.3 km
BMW Manufacturing Co11 MW30.7 km