Franklin Farms 1&2Planned
Richland County, Louisiana · EIA plant ID 68214 · Operator: Entergy Louisiana LLC
1,561 MW planned (Natural Gas Fired Combined Cycle), first expected Dec 2028 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1A | Natural Gas Fired Combined Cycle | CT | 469.3 | 435.4 | planned Dec 2028 | Planned | — | coming soon |
| 1B | Natural Gas Fired Combined Cycle | CA | 311 | 302.8 | planned Dec 2028 | Planned | — | coming soon |
| 2A | Natural Gas Fired Combined Cycle | CT | 469.3 | 435.4 | planned Dec 2028 | Planned | — | coming soon |
| 2B | Natural Gas Fired Combined Cycle | CA | 311 | 302.8 | planned Dec 2028 | Planned | — | coming soon |
Owner / operator
Operator: Entergy Louisiana LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Richland Parish Power Station 3 | — | 7.8 km |
| Richland Parish Power Station 4 | — | 7.8 km |
| Richland Parish Power Station 1&2 | — | 8.7 km |
| SR Dunn | — | 9.5 km |
| SR Delhi | — | 13.4 km |
| Oak Ridge Solar | 200 MW | 15.8 km |