← Back to map

Templeton WindPlanned

Benton County, Indiana · EIA plant ID 68179 · Operator: Templeton Wind Energy Center, LLC
WindMISOBA: MISO

200 MW planned (Onshore Wind Turbine), first expected Jun 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TEMPWOnshore Wind TurbineWT200.2200.2planned Jun 2027Planned—coming soon

Owner / operator

Operator: Templeton Wind Energy Center, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Meadow Lake Wind Farm III LLC104 MW14.1 km
Fowler Ridge Wind Farm LLC588 MW17 km
Meadow Lake Wind Farm II LLC102 MW17.4 km
Meadow Lake Wind Farm VI LLC200 MW19.3 km
Meadow Lake Wind Farm IV106 MW20.2 km
Tippecanoe Solar Power Plant2 MW20.9 km