Rio Lago SolarUnder construction

Bandera County, Texas · EIA plant ID 68155 · Operator: Rio Lago Solar, LLC
SolarERCOTBA: ERCO

123 MW under construction (Solar Photovoltaic), first expected Nov 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 123 MW building
Net generation4GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0123GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RIOLASolar PhotovoltaicPV123123planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Rio Lago Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Regis Medina—16.4 km
Regis Medina Lake10 MW22.2 km
Ranchtown10 MW38 km
HEB_CPS007931 MW40.1 km
Regis Utopia10 MW43.2 km
Dunlay Solar—49.1 km