← Back to map

Coffeen Solar BESS

Montgomery County, Illinois · EIA plant ID 68147 · Operator: Dynegy Inc
SolarBatteriesSolar PhotovoltaicMISOBA: MISO
Nameplate46MWSummer 46 MW
Generators2in service
Net generation94GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02.557.510GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202724.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20242.16.5%—
202585.122.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV44.244.2Dec 2024Operating—coming soon
2BatteriesBA22Dec 2024Operating—coming soon

Owner / operator

Operator: Dynegy Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dynegy Inc100.0%46 MW

Nearby plants

Within 80 km.
Horseshoe Solar Project, LLC—9.7 km
Anacott5 MW10 km
Bluestar Solar Project, LLC5 MW10.3 km
AC IL - Hillsboro CSG5 MW12.8 km
McCray Solar 1, LLC5 MW19.7 km
PIKE Solar—23 km