Catalina Solar (SC)
Saluda County, South Carolina · EIA plant ID 68060 · Operator: Catalina Solar, LLC
Nameplate75MWSummer 75 MW
Generators1in service
Net generation131GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2025
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2025 | 26.1 | 15.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| CAT01 | Solar Photovoltaic | PV | 75 | 75 | Oct 2025 | Operating | — | coming soon |
Owner / operator
Operator: Catalina Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Catalina Solar, LLC | 100.0% | 75 MW |
Nearby plants
Within 80 km.
| Beulah Solar | 75 MW | 5.5 km |
| Saluda Solar II | 3 MW | 17.5 km |
| Saluda Solar, LLC | 7 MW | 18.2 km |
| Allora Solar, LLC | 75 MW | 18.6 km |
| Shaw Creek Solar, LLC | 75 MW | 29.1 km |
| Diamond Solar | 8 MW | 32.9 km |