Prairie Center Energy LLC

Adams County, Colorado · EIA plant ID 68058 · Operator: Whetstone Power Operations LLC
BatteryBatteriesBA: WACM
Nameplate35MWSummer 34 MW
Generators1in service
Net generation-2GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2024

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-400-300-200-1000MWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2024-0.3——
2025-1.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PCEBSBatteriesBA35.433.7Dec 2024Operating—coming soon

Owner / operator

Operator: Whetstone Power Operations LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Prairie Enhanced, LLC100.0%35 MW

Nearby plants

Within 80 km.
Bromley Battery Storage12 MW5.8 km
Oak Leaf Solar XXVI LLC2 MW6.1 km
Platte Valley Battery Storage8 MW7.8 km
Frank Knutson154 MW9.6 km
Oak Leaf Solar XXII LLC (CSG)2 MW9.9 km