Sunrose Renewable EnergyPlanned

Austin County, Texas · EIA plant ID 68033 · Operator: vesper energy development llc
BatteryERCOTBA: ERCO

600 MW planned (Batteries, Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SNRSESolar PhotovoltaicPV300300planned Dec 2027Planned—coming soon
SRSEBBatteriesBA300300planned Dec 2027Planned—coming soon

Owner / operator

Operator: vesper energy development llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Bovine10 MW6.4 km
Denali Energy Storage—6.4 km
E-Volve Energy Holdings LLCretired8.3 km
Raven Storage—11.4 km
East Bernard—16.9 km
Fort Bend Solar LLC240 MW18.6 km