Bright Mountain SolarPlanned

Perry County, Kentucky · EIA plant ID 67990 · Operator: Avangrid Renewables Inc
SolarPJMBA: PJM

80 MW planned (Solar Photovoltaic), first expected Dec 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BM1Solar PhotovoltaicPV8080planned Dec 2027Planned—coming soon

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Starfire Mountain Solar—19.7 km
Heidelberg Hydroelectric Project—52 km
Evelyn Hydroelectric Project—59.7 km
Greater Wise Solar Project—66.8 km
Matilda Hamilton Fee Hydroelectric Station3 MW72.8 km
Mineral Gap3 MW74.5 km