← Back to map

Meadow Springs Renewable Energy (Hybrid)Planned

White County, Illinois · EIA plant ID 67986 · Operator: vesper energy development llc
BatteryMISOBA: MISO

300 MW planned (Batteries, Solar Photovoltaic), first expected Jun 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
MSPRBBatteriesBA150150planned Jun 2028Planned—coming soon
MSPRESolar PhotovoltaicPV150150planned Jun 2028Planned—coming soon

Owner / operator

Operator: vesper energy development llc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Norris City 2—1.3 km
Big River Solar149 MW2.6 km
Pawpaw (IL)—10.9 km
Carmi13 MW13 km
Boomtown Renewable Energy Center150 MW17.8 km
Eldorado Solar II120 MW21.7 km