Yuma County, Arizona · EIA plant ID 67973 · Operator: Leeward Asset Management, LLC
BatteryBatteriesBA: AZPS
Nameplate113MWSummer 113 MW
Generators1in service
Net generation-28GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-4-3-2-10GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025-5.1——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SP01BatteriesBA113113Oct 2025Operating—coming soon

Owner / operator

Operator: Leeward Asset Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Leeward Asset Management, LLC100.0%113 MW

Nearby plants

Within 80 km.
White Wing Solar179 MW0.1 km
Agua Caliente Solar Project348 MW2.3 km
Elisabeth Solar—4.6 km
McFarland A Solar and Storage300 MW5.1 km
McFarland B Solar and Storage450 MW5.2 km
McFarland C185 MW5.6 km