Agave

Maricopa County, Arizona · EIA plant ID 67964 · Operator: Arizona Public Service Co
SolarSolar PhotovoltaicBA: AZPS

150 MW under construction (Batteries), first expected Nov 2026 · EIA-860M

Nameplate150MWSummer 150 MW
Generators1in service · 150 MW building
Net generation313GWh12 mo to Aug 2026
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202420252026202723.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202498.97.5%—
2025297.822.7%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
A150MSolar PhotovoltaicPV150150Sep 2023Operating—coming soon
A400MBatteriesBA150150planned Nov 2026Under construction—coming soon

Owner / operator

Operator: Arizona Public Service Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Arizona Public Service Co100.0%150 MW

Nearby plants

Within 80 km.
Red Hawk1,127 MW1.2 km
Sun Streams 2150 MW2.2 km
Arlington Valley Solar Energy II129 MW2.2 km
Sun Streams 3430 MW2.7 km
Sun Streams, LLC160 MW2.8 km
Mesquite Generating Station Block 1692 MW3.3 km