Allegany County, Maryland · EIA plant ID 67962 · Operator: Dans Mountain Wind Force, LLC
WindOnshore Wind TurbinePJMBA: PJM
Nameplate55MWSummer 55 MW
Generators1in service
Net generation168GWh12 mo to Aug 2026
Capacity factor35%wind units, summer MW
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
05101520GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20252026202735.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202590.127.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DMTNOnshore Wind TurbineWT54.954.9May 2025Operating—ge 6.1-158

Owner / operator

Operator: Dans Mountain Wind Force, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dans Mountain Wind Force, LLC100.0%55 MW

Nearby plants

Within 80 km.
Jade Meadow LLC20 MW5.2 km
Fourmile Ridge40 MW11.3 km
AES Warrior Run Cogeneration Facilityretired12.5 km
AES Warrior Run Energy Storage Projectretired12.5 km
Twin Ridges Wind Farm139 MW17.9 km