← Back to map

Goshen SolarPlanned

Goshen County, Wyoming · EIA plant ID 67936 · Operator: Goshen Solar, LLC
SolarBA: WACM

163 MW planned (Solar Photovoltaic), first expected Dec 2030 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GS1Solar PhotovoltaicPV163163planned Dec 2030Planned—coming soon

Owner / operator

Operator: Goshen Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Laramie River Station1,863 MW42.3 km
Guernsey6 MW53 km
Western Meadowlark Solar SCS NE 1, LLC4 MW70.8 km
Gering Solar4 MW71.6 km
Western Sugar Coop - Scottsbluff7 MW72 km
Glendo38 MW77.8 km