Steelhead Energy StoragePlanned

Fannin County, Texas · EIA plant ID 67798 · Operator: GRS BESS Texas Seven, LLC
BatteryERCOTBA: ERCO

194 MW planned (Batteries), first expected Sep 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GRS7BatteriesBA193.7190.1planned Sep 2027Planned—coming soon

Owner / operator

Operator: GRS BESS Texas Seven, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
G.S.E. One LLC83 MW14.8 km
Platinum Storage348 MW20 km
Whitewright Solar10 MW25.4 km
Coniglio Solar124 MW26.4 km
WAL9471 MW42.3 km
Roscommon Solar Park—42.8 km