← Back to map

SMT Ironman Battery Storage Plant

Brazoria County, Texas · EIA plant ID 67737 · Operator: SMT Ironman BESS LLC
BatteryBatteriesERCOTBA: ERCO
Nameplate304MWSummer 304 MW
Generators1in service
Net generation-26GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2025

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-3-2-10GWh2026

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2025-13.3——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SMTIRBatteriesBA304304Jun 2025Operating—coming soon

Owner / operator

Operator: SMT Ironman BESS LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SMT Ironman BESS LLC100.0%304 MW

Nearby plants

Within 80 km.
SAHARA BESS (SOHO BESS)409 MW0.4 km
Bocanova Energy Storage II150 MW6.1 km
Bocanova Energy Storage150 MW6.1 km
Tortolas50 MW6.3 km
Alvin10 MW6.4 km
WAL4621 MW8.5 km