Kingstree West 115Under construction
Williamsburg County, South Carolina · EIA plant ID 67723 · Operator: Kingstree West 115 LLC
75 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation24GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| SOLAR | Solar Photovoltaic | PV | 74.9 | 74.9 | planned Oct 2026 | Under construction | — | coming soon |
Owner / operator
Operator: Kingstree West 115 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Sunflower Solar LLC | 10 MW | 12.4 km |
| Bonefish Solar | 2 MW | 22.1 km |
| Abbot Solar | 2 MW | 26.5 km |
| Sapphire Solar | 2 MW | 26.7 km |
| Bani Solar | 2 MW | 28.9 km |
| Blacktip Solar | 2 MW | 29.4 km |