Kingstree West 115Under construction

Williamsburg County, South Carolina · EIA plant ID 67723 · Operator: Kingstree West 115 LLC
SolarBA: CPLE

75 MW under construction (Solar Photovoltaic), first expected Oct 2026 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation24GWh12 mo to Aug 2026
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
SOLARSolar PhotovoltaicPV74.974.9planned Oct 2026Under construction—coming soon

Owner / operator

Operator: Kingstree West 115 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Sunflower Solar LLC10 MW12.4 km
Bonefish Solar2 MW22.1 km
Abbot Solar2 MW26.5 km
Sapphire Solar2 MW26.7 km
Bani Solar2 MW28.9 km
Blacktip Solar2 MW29.4 km